[ale] Linux Cluster Server Room
Jonathan Glass
jonathan.glass at ibb.gatech.edu
Mon Apr 19 11:23:16 EDT 2004
Just for the cluster, I have a 6kVa BestPower UPS. It'll run all 16
nodes for about 15 minutes.
Jonathan
On Mon, 2004-04-19 at 10:57, Chris Coleman wrote:
> What type of UPS system are you using? Do most install a large UPS system for the entire server room? If so, how much will this cost?
>
> Thanks,
> Chris
>
> -----Original Message-----
> From: Dow Hurst [mailto:dhurst at kennesaw.edu]
> Sent: Monday, April 12, 2004 11:20 AM
> To: ale
> Subject: Re: [ale] Linux Cluster Server Room
>
>
> Thanks Jonathon! That is exactly the kind of ballpark I needed! I don't need
> the vendors right now as we are still kicking around ideas. If anyone would
> throw some specs or ideas out there, I'd appreciate it. Here is a quick
> question? Is planning for double your planned load a good rule? I would
> think that would be a good idea. How about backup cooling if the main unit
> dies? The firesafe is one I had not thought of.
> Dow
>
>
> Jonathan Glass (IBB) wrote:
> > How big are the Opteron nodes? Are they 1,2,4U? How big are the power
> > supplies? What is the maximum draw you expect? Convert that number to
> > figure out how much heat dissipation you'll need to handle.
> >
> > I have a 3-ton A/C unit in my 14|15 x 14|15 server room, and the 24-33
> > node cluster I just spec'd out from IBM (1U, Dual Opterons) was rated at
> > a max heat dissipation (is this the right word?) of 18,000 BTU.
> > According to my A/C guy, the 3-ton unit can handle a max of 36,000 BTU,
> > so I'm well inside my limits. Getting the 3-ton unit installed in the
> > drop-down ceiling, including installing new chilled water lines, was
> > around $20K.
> >
> > I do have sprinkler fire protection, but that room is set to release its
> > water supply independent of the other rooms. Also, supposedly, the fire
> > sprinkler heads (whatever they're called) withstand considerably more
> > heat than normal ones. So, the reasoning goes, if it gets hot enough
> > for those to go off, I have bigger problems than just water. Thus, I
> > have a fire safe nearby (in the same bldg...yeah, yeah, I know; off-site
> > storage!) that holds my tapes, and will shortly hold a hardware
> > inventory and admin password list on all my servers.
> >
> > If you want my list of vendors, send me an email off-list, or call my
> > office, and I'll see if I can track down the DPOs for you.
> >
> > Thanks
> >
> > Jonathan Glass
> >
> > On Fri, 2004-04-09 at 17:35, Dow Hurst wrote:
> >
> >>If I needed to take an existing space 400 square feet w/8' ceiling,
> >>20'x20'x8', and add A/C and fire protection for a server room, what kind of
> >>cost would be incurred? Sounds like an algebra problem from highschool
> >>doesn't it? Let's say a full 84" rack of 4CPU Opteron nodes and supporting
> >>hardware were in the room. Does anyone have any ballpark figures they could
> >>throw out there? Any links I could be pointed to?
> >>Thank a bunch,
> >>Dow
> >>
> >>
> >>PS. I'd like some other type of fire protection than sprinkler heads. ;-)
> >
> >
> >
--
Jonathan Glass
Systems Support Specialist II
Institute for Bioengineering & Bioscience
Georgia Institute of Technology
Email: jonathan.glass at ibb.gatech.edu
Office: 404-385-0127
Fax: 404-894-2291
More information about the Ale
mailing list